What happened
Netty is an asynchronous, event-driven network application framework. In versions prior to 4.1.132.Final and 4.2.10.Final, a remote user can trigger a Denial of Service (DoS) against a Netty HTTP/2 server by sending a flood of `CONTINUATION` frames. The server's lack of a limit on the number of `CONTINUATION` frames, combined with a bypass of existing size-based mitigations using zero-byte frames, allows an user to cause excessive CPU consumption with minimal bandwidth, rendering the server unresponsive. Versions 4.1.132.Final and 4.2.10.Final fix the issue.
Affected versions
netty: < 4.1.132.Final; >= 4.2.0.Alpha1, < 4.2.10.Final Fixed: See vendor advisory.
Why it matters
Review the vendor advisory and exposure of the affected product to determine operational impact.
Detection & mitigation
- Apply vendor-provided updates or mitigations.
- Review affected product exposure and access logs.
Public PoC references
No public PoC reference has passed the current publication threshold.